中文版        EngLish
Login: Account: Password:
NEWS
Industry News
Photo News
首页 - NEWS - Industry News - 正文
  Industry News
China starts construction of new hydropower plant on Yalong River
作者:本站  来源:网络  点击:1356 次  发布时间:2009-10-22
China started construction of another major hydropower station, designed to have an installed capacity of 4.8 million kilowatts, in the southwestern province of Sichuan on Tuesday, according to local sources.
Known as the second-tier hydropower plant at Jiping, a bend in the Yalong River , the project involves a total investment of 29.8 billion yuan(about 3.73 billion U.S. dollars). It is scheduled to be completed in 105 months.
The developer, the State Development and Investment Corporation, said the new plant is the largest of a series of hydropower plants to be constructed on the 1,571-km-long Yalong River.
Construction of Er-tam hydropower station, located at the lower reached of the Yalong River and with an installed capacity of 3.3 million kw, has been completed.
Construction of the first-tier hydropower plant at jIping ,with a designed installed capacity of 3.6 million kw, began in November.
  Links
国家开发银行 智联招聘 新浪网 东方财富网 国家开发投资公司 百度
Copyright@Sichuan Hechuan Investment Co., Ltd.
Address:12th Floor, Xiyue Mansion, No.7, Third West Section of First Ring Road, Chengdu, Sichuan, CHINA
ZIP:610000 Phone:028-87769509